Blast-furnace shop

Products

201 Brushed Stainless Steel Coil

short description:

Standard: GB, JIS, ASTM, DIN, EN, AISI
Place of Origin: Shandong, China
Brand: LIKE
Coils Model: length: C width: 20-1500mm thickness: 0.3-250mm
Tolerance: ±0.1mm


Product Detail

Product Tags

VIDEO

Aluminum (1)
Aluminum (2)
Aluminum (3)
201 brushed stainless steel coil

Standard: GB, JIS, ASTM, DIN, EN, AISI
Place of Origin: Shandong, China
Brand: LIKE
Coils Model: length: C width: 20-1500mm thickness: 0.3-250mm
Tolerance: ±0.1mm
Delivery time: 7-15 days
Surface finishing: 2B, 2D, No. 1, No. 4, BA, HL, 6K, 8K, polishing, annealing, pickling, bright, etc.
Certificate: ISO9001
Supply capacity: 20,000 tons/year
MOQ: 1 ton
Payment: 30%TT+70%TT/LC
Payment: T/T, L/C, Western Union
Tests: squash test, extension test, hydrostatic test, crystal decay test, heat resistance

Stainless steel (4)

◆ Stainless steels are defined as ferrous alloys with the addition of at least 10.5%.
◆ chromium by weight and are essentially low carbon steels containing significant amounts of chromium. It is the addition of chromium that gives this type of steel its corrosion resisting properties.
◆ Stainless steel coil is used for a huge variety of applications in many diverse industries including nuclear,pharmaceutical,food processing, petrochemical, architecture, and chemical transportation.

Aluminum (5)
Aluminum (6)

● 1. payment terms: T/T:30% advanced,70% balanced to pay after shipment L/C:irrevocable 100% L/C as sight.
● 2. Delivery time: In 5 days after getting the deposit (including the pattern making time).
● 3. MOQ: small quality accepted.
● 4. Samples: sample can be provided according to customer's requirements or after getting customer's drawings. sample cost should be afforded by customer and return back when place big order.

Aluminum (7)
Aluminum (8)

Q: What’s your main products?
A: Hot rolled, Cold rolled, Galvanized/Galvalume steel coils, prapainted galvanized steel coils, stainless steel coil and sheets, steel plate & color steel tile etc.

Q: Can we visit your factory?
A: Of course. If we have your schedule, we will arrange our professional sales team to follow up your case.

Q: How can you ensure the quality?
A: All products have to go through three checks in the whole processing,we have professional team to deal with everything.

Q: What is your delivery time?
A: within 3 - 5 working days after receiving your balance payment.

Q: What kind of equipment in your factory?
A: Our factory have advanced hot rolled and cold rolling production equipment and testing equipment,it can ensure the quality,high efficiency.


  • Previous:
  • Next: