Blast-furnace shop

Products

Epoxy Coated Carbon Steel Coil

short description:

Standard: GB, JIS, ASTM, DIN, EN, AISI
Place of Origin: Shandong, China
Brand: LIKE
Coils Model: length: C width: 20-1500mm thickness: 0.3-250mm
Tolerance: ±0.1mm
Delivery time: 7-15 days


Product Detail

Product Tags

Aluminum (1)
Aluminum (2)
Aluminum (3)
epoxy coated carbon steel coil (5)

Standard: GB, JIS, ASTM, DIN, EN, AISI
Place of Origin: Shandong, China
Brand: LIKE
Coils Model:length:C width:20-1500mm thickness:0.3-250mm
Tolerance: ±0.1mm
Delivery time: 7-15 days
Surface finishing: 2B, 2D, No. 1, No. 4, BA, HL, 6K, 8K, polishing, annealing, pickling, bright, etc.
Certificate: ISO9001
Supply capacity: 20,000 tons/year
MOQ: 1 ton
Payment: 30%TT+70%TT/LC
Payment: T/T, L/C, Western Union
Tests: squash test, extension test, hydrostatic test, crystal decay test, heat resistance

carbon steel (4)

◆ Because high strength, good toughness, easy processing and good weldability and other excellent properties, it is widely used in shipbuilding, automobile, bridge, construction, machinery, pressure vessel and other manufacturing industries.liner, barrels, iron ladders and various shapes of stamping parts.

◆ It is mainly used to make structural parts such as car girder, beam, transmission shaft and car chassis parts.

Aluminum (5)
Aluminum (6)

01 Processing Service
Laser cutting, welding, surface polishing, etc.

02 Consultancy Services
Put forward suggestions and recommendations for the application of products.

03 Other
Product inspection and logistics insurance.

04 Customer Inspection
We have our own manufacturing factory, and welcome customers to come to visit the factory.

Aluminum (7)
Aluminum (8)

Q: What’s your main products?
A: Hot rolled,Cold rolled,Galvanized/Galvalume steel coils, prapainted galvanized steel coils, stainless steel coil and sheets, steel plate & color steel tile etc.

Q: Can we visit your factory?
A: Of course. If we have your schedule, we will arrange our professional sales team to follow up your case.

Q: What kind of equipment in your factory?
A: Our factory have advanced hot rolled and cold rolling production equipment and testing equipment,it can ensure the quality,high efficiency.

Q: How long is your delivery time?
A: Generally it is 3-5 days if goods are in stock. or around 30days if the goods are not in stock and it is according to order requirement.


  • Previous:
  • Next: